The Minister of Regional Development, Abubakar Momoh, has called on the Niger Delta Development Commission to accelerate the reconstruction work on the heavily utilized Sapele-Benin Expressway linking Edo and Delta states. The federal official inspected various damaged sections of the vital transportation corridor alongside senior agency leadership, expressing urgency over restoring smooth vehicular movement along the route.
The inspection tour covered several distressed points including areas in Warri-Sapele, Ethiope West, and Sapele local government areas. Officials noted that the ongoing intervention targets approximately 15.4 kilometres of failed roadway sections that previously caused severe gridlock and vehicular accidents for motorists traversing the South-South region.
According to project representatives, the repair works are being executed in structured stages to prevent a total shutdown of the major regional artery. The site contractor indicated that the remaining rehabilitation phases could be completed within three months, provided that weather conditions remain favourable for heavy engineering work.
The Federal Government emphasized that the initiative forms part of broader efforts to upgrade infrastructure along major transport corridors under current national development priorities. Stakeholders expressed optimism that completing the repairs will significantly ease logistics, lower transit risks, and bolster economic activities across both states.
Source reporting: Punch — 2026-11-12 14:34:36

0 comments
Join the discussion with a respectful, relevant comment.